Structural Engineering


Structural alterations constitute significant and fundamental change in the configuration or framework of a building. Over the years we have worked for local authorities, large national contractors, M.O.D. and the NHS. Our approach to projects involving major structural alterations include detailed methodology to ensure the project is carried out professionally. Through expert communication with structural engineers we ensure that the appropriate propping and support systems are implemented and followed. The detailed planning and relevant information will then pass to our on site engineers who will then accurately follow all necessary drawings, calculations and specifications to ensure the project is carried out correctly, on time, on budget and most of all safely.

What We Cover

In our illustrious career we have implemented countless support systems which in turn then allowed us to alter all manner of structural elements from various buildings, some including but not inclusive too.

Load bearing wall removal
Load bearing wall removal
Lift shaft alterations
Lift shaft alterations
forming of openings
forming of openings

Doorways

Needling propping systems
Needling propping systems
Accro propping systems
Accro propping systems

What's Included

Here we have a brief breakdown of the individual items which collectively enable Metals and Plant Ltd to offer such a safe high class service.

1
Site Visit

A Comprehensive and professional site audit will be undertaken to allow all necessary site specific documentation to be produced.

2
Environmental Assessment

A comprehensive assessment will be undertaken to highlight any potential environmental issues in line with works envisaged to be undertaken.

3
COSHH

A detailed task specific COSHH assessment will be undertaken to enable us to highlight any potential asbestos, substances, fumes that might cause a potential hazard.

4
Structural Survey / Report

To complete the work safely a structural survey / report may need to be undertaken to highlight any potential structural failings. This then allows all necessary precautions and support systems to be put in place if applicable.

5
Risk Assessments

A detailed task and site specific risk assessment will be completed to allow the works to be undertaken safely.

6
Quotation

A detailed and competitive quotation will be produced with all potential assets from the works being offset to enable the client to receive the lowest possible quote.

7
Method Statement

A detailed task and site specific method statement will be completed with all current safe working procedures implemented.

8
Highways Agency

We will deal with all necessary correspondence with relevant government agencies in relation to possible road closures / permits to complete the work safely and legally.

9
Insurances

Proof of Metals and Plant's full comprehensive insurance cover will be presented to the client before work commences.

10
Project Management

The works will be undertaken by highly trained Metals and Plant Ltd personnel who will oversee the contract through to its safe and environmentally friendly completion.

11
Waste Stream Documentation

All relevant documentation in regards to monitoring the waste streams produced from our site activities will be recorded and presented to the client for their SWMP.

Peglar Yorkshire
British Rail
M3
Finnegan
Kier
ISG
Ministry Of Defence
NHS
Sheffield Forge Masters
Carillion
Seba
Wates